Transform your iPhone into a professional cycle computer. Effortlessly track your routes, monitor calories, and reach your fitness goals with intuitive GPS data and seamless Apple Watch integration.
Publisher
Category
Health & FitnessDownloads
1M+User Rating
Total Ratings
16K+Locales
10Discover the interface used by 1M+ users.
The tools that make this app stand out, trusted by 1M+ users.
Track every turn with precision. Monitor your elevation, speed, and distance in real-time using our highly optimized location engine built for serious cyclists.
Leave your phone in your pocket. Control your ride and view live stats instantly on your wrist for a safer, more focused, and distraction-free cycling experience.
Turn data into results. Get hyper-accurate calorie tracking based on your profile and export your ride history to analyze your progress over time.
Trusted by 1M+ people who love this app.
"I’ve tried many cycling apps, but this is the first one that doesn't feel like a chore. The Apple Watch integration is seamless—I just hit start and go. Seeing my progress and calories burned in such a clean interface keeps me motivated for my daily morning rides!"
"The GPS accuracy is phenomenal, even on remote trails. As someone who likes to keep a detailed log of my elevation and speed, the GPX export feature is a game-changer. It’s professional-grade tracking without the unnecessary social media noise."
Everything you need to know about Bike Ride Tracker: Bicycle GPS.
Description
Latest Version
4.6.1
Size
127.6 MB
First Released
Aug 3, 2011
Apps with similar features and user experience
Chengdu Ledong Information & Technology Co., Ltd.
Zauberflote B.V.
Chengdu Dingchao Tech Co., Ltd.
Chongqing Gangduo Technology Co., Ltd.
OAO CO.,LTD.
XOSS HONG KONG CO., LIMITED
Abvio Inc.
WHEELE ACTIVITY SOFTWARE Inc
Tinderhouse