Publisher
Category
GamesDownloads
713K+User Rating
Total Ratings
28K+Locales
2Discover the interface used by 713K+ users.
The tools that make this app stand out, trusted by 713K+ users.
Experience the legendary Crazy Stone engine, combining Neural Networks with Monte Carlo Tree Search for a human-like, high-level challenge.
Validate your progress with formal Dan/Kyu rating tests provided by the International AI Go Association and earn recognized digital certificates.
Perfect your game using SGF file exports, automatic territory calculation, and move analysis tools designed for the serious strategy enthusiast.
Trusted by 713K+ people who love this app.
"The integration of Deep Learning technology makes every match feel like a lesson. I've used it to prepare for my IAGA certification tests, and the 5-Dan AI level is an incredible sparring partner for high-level play. It's the gold standard for Go apps."
"What I love most is the flexibility. Whether I'm practicing on a 9x9 board during my break or analyzing a complex 19x19 game with SGF exports, the experience is seamless. The AI doesn't just play to win; it plays with a style that helps me understand my own weaknesses."
Everything you need to know about CrazyStone DeepLearning.
Description
Latest Version
3.1.8
Size
147.6 MB
First Released
Jul 19, 2017
Top-ranked apps in the same category
ARETIS LIMITED
XD Entertainment Co., Ltd.
Hitapps Games LTD
Roblox Corporation
Microfun Limited
Lessmore UG haftungsbeschraenkt
PLR Worldwide Sales Limited
FUNFLY PTE. LTD.
VITA STUDIO PTE. LTD.