Publisher
Category
SportsDownloads
54K+User Rating
Total Ratings
1K+Locales
1Discover the interface used by 54K+ users.
The tools that make this app stand out, trusted by 54K+ users.
Go beyond basic tracking with sport-specific data like downhill distance and run counts for skiing, or paddling statistics synced to Apple Health.
Effortlessly close your activity rings and analyze heart rate data through deep integration with your iPhone and Apple Watch.
Relive your performance with detailed map playbacks and audio feedback on every mile, allowing you to analyze your speed and pace with precision.
Trusted by 54K+ people who love this app.
"Finally, an app that understands skiing! I love how it separates my downhill distance from time on the lift. Being able to playback my runs on the map after a day on the slopes is addictive. It is the only tracker I need for both winter and summer sports."
"As someone who switches between morning runs and weekend paddling, having one app for everything is a game-changer. The Apple Watch integration is seamless, and the audio feedback keeps me on pace without checking my phone. Plus, closing my rings feels great!"
Everything you need to know about Distance Tracker All Sports.
Description
Latest Version
2.3.0
Size
78.9 MB
First Released
Apr 28, 2018
Apps with similar features and user experience
Chengdu Ledong Information & Technology Co., Ltd.
Zauberflote B.V.
Chengdu Dingchao Tech Co., Ltd.
Chongqing Gangduo Technology Co., Ltd.
OAO CO.,LTD.
Polar Electro Oy
Beijing Free Calculator Technology Co., Ltd.
XOSS HONG KONG CO., LIMITED
ExaMobile S.A.