Dulook DXB

Dulook DXB

Download on App Store
Spark by MWM logo
Logo of Dulook DXB

Dulook DXB: Astronomical Precision for Your Daily Prayer & Qibla

The official, ad-free guide trusted by thousands worldwide. Experience government-vetted accuracy, AR-powered direction finding, and inclusive features designed for every Muslim, everywhere.

Download on App Store

Publisher

Islamic Affairs & Charitable Activities Department

Category

Lifestyle

Downloads

310K+

User Rating

4.7/5

Total Ratings

3K+

Locales

2

Precision at a Glance

Discover the interface used by 310K+ users.

A screenshot of the Dulook DXB app interface displaying a grid of country flags for selecting accurate prayer times globally.

A screenshot of the Dulook DXB app interface displaying a grid of country flags for selecting accurate prayer times globally.

Dulook DXB smartphone app interface displaying Islamic prayer times and accessibility features for people of determination

Dulook DXB smartphone app interface displaying Islamic prayer times and accessibility features for people of determination

Smartphone displaying Dulook DXB app calculation of prayer times based on altitude

Smartphone displaying Dulook DXB app calculation of prayer times based on altitude

Dulook DXB app widgets for prayer times and calendar on iPhone

Dulook DXB app widgets for prayer times and calendar on iPhone

Dulook DXB mobile app interface showing global country selection and accurate prayer time schedules

Dulook DXB mobile app interface showing global country selection and accurate prayer time schedules

Dulook DXB app interface showing automatic location detection and manual city selection options for prayer times.

Dulook DXB app interface showing automatic location detection and manual city selection options for prayer times.

Interface of Dulook DXB app showing alternative prayer times calculation settings for high latitude areas

Interface of Dulook DXB app showing alternative prayer times calculation settings for high latitude areas

Dulook DXB app showing global coverage with over 50000 cities and 190 countries for accurate prayer calculations.

Dulook DXB app showing global coverage with over 50000 cities and 190 countries for accurate prayer calculations.

Two smartphone screens displaying the distinctive color design and prayer times of the Dulook DXB app.

Two smartphone screens displaying the distinctive color design and prayer times of the Dulook DXB app.

Dulook DXB app interface showing Qibla direction using augmented reality and map tracking

Dulook DXB app interface showing Qibla direction using augmented reality and map tracking

Precision Prayer, Redefined

The tools that make this app stand out, trusted by 310K+ users.

🛰️

Verified Astronomical Precision

The first app using Sharia-compliant criteria from government experts, adjusting for altitude to ensure your prayer times are perfectly accurate anywhere on Earth.

Premium Ad-Free Experience

Focus on your spiritual journey without intrusive distractions. Enjoy a clean, minimalist interface designed to respect your privacy and your devotion.

Inclusive for Everyone

A pioneer in accessibility, providing specialized features for people of determination alongside smart AR tools to find the Qibla with 360-degree accuracy.

Loved by users worldwide

Trusted by 310K+ people who love this app.

"

"As a frequent traveler between the US and Europe, I've found Dulook DXB to be the most reliable app for precise prayer times. The altitude-based calculations and the AR Qibla finder are incredibly accurate, and the lack of intrusive ads makes a huge difference in my daily focus."

Omar K.
"

"I am so impressed by the inclusive design; it is rare to find an app that is genuinely friendly to people of determination. The astronomical precision backed by the IACAD gives me total peace of mind, and the minimalist widgets fit perfectly with my iPhone's aesthetic."

Sarah J.

About the app

Everything you need to know about Dulook DXB.

Description

The first international app using astronomical Sharia-compliant criteria issued by a government institution (Islamic Affairs and Charitable Activities Department in Dubai, under the supervision of the International Astronomical Center). The first app friendly to people of determination in this field. Most accurate in calculating prayer times (for Muslims in all parts of the world). More than 50 thousand known cities and 190 countries. Qibla by smart methods and augmented reality (360) degrees. Contains widgets in various shapes and sizes. The only app that allows users to calculate alternative prayer times when the Sharia signs disappear. No annoying ads. Takes into account the altitude when calculating prayer times. Matches the official timings of many countries. Flexibility in choosing the criteria for calculating prayer times (for specialists). Determines users’ location through many options automatically, or through choosing one’s location from the world map, or choosing from a list of cities for each country.

Latest Version

3.0.28

Size

149.0 MB

First Released

May 12, 2018

Align Your Day with Divine Precision

Join 310,000+ users and experience the world’s first government-certified, ad-free prayer companion—designed with astronomical accuracy and inclusivity for every believer.

Download on App Store