数感星球-计算训练数感启蒙好帮手

数感星球-计算训练数感启蒙好帮手

Download on App Store
Spark by MWM logo
Logo of 数感星球-计算训练数感启蒙好帮手

Number Sense Planet: Mastering Math Through the Singapore CPA Method

Empower your child aged 3-10 with an AI-driven, gamified curriculum designed for STEM success. Turn daily practice into a playful adventure and build a rock-solid foundation in math fluency without the stress.

Download on App Store

Publisher

Ahaaa Education Technology Co., Ltd.

Category

Education

Downloads

619K+

User Rating

4.7/5

Total Ratings

6K+

Locales

2

See Math in Action

Discover the interface used by 619K+ users.

Ahaaa Math app interface showing AI progress reports, counting games, and a friendly cartoon mascot for children.

Ahaaa Math app interface showing AI progress reports, counting games, and a friendly cartoon mascot for children.

Gamified multiplication practice screen for children in the Number Sense Planet app featuring colorful characters and interactive puzzles.

Gamified multiplication practice screen for children in the Number Sense Planet app featuring colorful characters and interactive puzzles.

Interactive Singapore Math CPA method demonstrating visual addition on Number Sense Planet app

Interactive Singapore Math CPA method demonstrating visual addition on Number Sense Planet app

A visual math problem in the Number Sense Planet app using the Singapore CPA method for teaching subtraction.

A visual math problem in the Number Sense Planet app using the Singapore CPA method for teaching subtraction.

A progress report in the Ahaaa Math app showing a childs knowledge mastery levels and specific missed math questions for parental review

A progress report in the Ahaaa Math app showing a childs knowledge mastery levels and specific missed math questions for parental review

Ahaaa Math app interface showing a 16 level scientific training path and a detailed math curriculum outline for children

Ahaaa Math app interface showing a 16 level scientific training path and a detailed math curriculum outline for children

Ahaaa Math app interface showing personalized math exercises including mental arithmetic and a mistake tracking book for students.

Ahaaa Math app interface showing personalized math exercises including mental arithmetic and a mistake tracking book for students.

An interactive vertical addition math problem on a digital learning screen with a friendly yellow character.

An interactive vertical addition math problem on a digital learning screen with a friendly yellow character.

Empowering the Next Generation of STEM Leaders

The tools that make this app stand out, trusted by 619K+ users.

🧱

The Singapore Math Advantage

Go beyond rote memorization with the Concrete-Pictorial-Abstract (CPA) method. We help children visualize math, transforming abstract numbers into intuitive concepts.

🤖

AI-Powered Personalized Path

Our smart engine identifies your child's unique learning gaps and tailors training sessions in real-time, providing the benefits of a private tutor at their fingertips.

🎮

Guilt-Free Gamified Learning

Replace passive screen time with active discovery. With 16 levels of interactive challenges, kids stay motivated while building the mental fluency needed for academic success.

Loved by users worldwide

Trusted by 619K+ people who love this app.

"

"As a parent who values the Singapore Math approach, I am blown away by how this app simplifies complex concepts. My 7-year-old is actually excited to practice every morning! The AI-driven reports give me peace of mind, showing exactly where he's improving without me having to grade a single worksheet."

Sarah M., New York
"

"Number Sense Planet is a game-changer for our daily routine. It transforms what used to be a struggle into an interactive adventure. The CPA methodology helps my daughter visualize numbers instead of just memorizing them, turning screen time into a truly productive learning experience."

David L., Austin

About the app

Everything you need to know about 数感星球-计算训练数感启蒙好帮手.

Description

【产品介绍】 数感星球是一款面向3-10岁孩子的数感计算训练APP,采用CPA教学法,打造16级的计算训练体系覆盖3-10岁用户的所有计算需求;将计算训练与趣味游戏相结合,阶梯式训练路径,将循序渐进的引导孩子主动解决问题,从而理解抽象的数学原理,无痛提升计算力。 【产品特色】 (1)AI智能精练系统,全面提升训练效率 • AI智能分析 定制个性化训练方案 • 智能题库推送 查漏补缺更精准 • 错题智能跟踪 强化薄弱环节 (2) 减轻家长督学压力,科学练习更轻松 • 基础-进阶-测评三步循环 • 数据化学习报告实时同步 • 系统化学习进度一目了然 (3) 游戏化趣味训练,激发学习主动性 • 寓教于乐,告别枯燥练习 • 趣味探索,保持学习兴趣 • 游戏闯关,培养学习动力。 (4)新加坡CPA教学理念,让数学更易懂 • 可视化互动学习体验 • 深度理解数学概念 • 动手实践,学以致用 (5)16级数感进阶体系,全方位算力提升 • 分级递进,因材施教 • 多维度练习,全面提升 • 紧贴教材,科学系统

Latest Version

9.15.2

Size

471.9 MB

First Released

Nov 15, 2019

Ready to Launch Your Child’s Math Journey?

Join over 600,000 families giving their kids the Singapore Math advantage. Download Number Sense Planet today for a 16-level, AI-powered adventure that turns boring drills into guilt-free, interactive learning.

Download on App Store