SeekU CPL – Track & Trust

SeekU CPL – Track & Trust

Download on App Store
Spark by MWM logo
Logo of SeekU CPL – Track & Trust

SeekU CPL – Keep Your Love on the Map and Your Heart at Peace

Strengthen your bond with real-time location tracking, 30-day movement history, and smart safety alerts designed exclusively for couples who value transparency, safety, and digital proximity.

Download on App Store

Publisher

晨铭 李

Category

Social Networking

Downloads

2K+

User Rating

4.8/5

Total Ratings

2K+

Locales

2

Love in Plain Sight

Discover the interface used by 2K+ users.

SeekU CPL app interface showing real-time GPS location and battery status for a couple on a map.

SeekU CPL app interface showing real-time GPS location and battery status for a couple on a map.

Interface of SeekU app showing a map with a tracked route and a timeline of daily activities like cycling and walking

Interface of SeekU app showing a map with a tracked route and a timeline of daily activities like cycling and walking

SeekU app private chat interface for couples showing location updates and floating emojis.

SeekU app private chat interface for couples showing location updates and floating emojis.

Smartphone display showing SeekU app notifications for partner location alerts and battery level tracking graph.

Smartphone display showing SeekU app notifications for partner location alerts and battery level tracking graph.

SeekU CPL app interface showing real-time location tracking and partner battery status for couples

SeekU CPL app interface showing real-time location tracking and partner battery status for couples

Strengthen Your Bond Through Transparency

The tools that make this app stand out, trusted by 2K+ users.

📍

Real-Time Peace of Mind

Eliminate the anxiety of unanswered texts by seeing your partner’s live location, battery levels, and signal strength at a single glance.

🛡️

Automated Safety Alerts

Set custom geofences for home, work, or the gym and receive instant notifications so you always know when they have arrived safely.

🗓️

30-Day Movement History

Build a foundation of radical transparency with a detailed month-long log of locations, travel modes, and durations of stay.

Loved by users worldwide

Trusted by 2K+ people who love this app.

"

"Being in a long-distance relationship is tough, but SeekU makes it feel like we're still part of each other's daily lives. I love being able to see that he made it home safely after work without having to wait for a text. The battery and signal insights are a total lifesaver for my anxiety!"

Chloe R.
"

"The smart alerts are a game changer for our busy city life. I get a notification when my fiancée leaves her office, so I can time dinner perfectly. The one-tap navigation also makes meeting up for spontaneous dates incredibly easy. It's about safety and connection, not just tracking."

Mark T.

About the app

Everything you need to know about SeekU CPL – Track & Trust.

Description

Real-Time Location & Movement Tracking App for Couples This is a dedicated app for couples to share real-time locations and movement history. Always know where your partner is, where they’ve been, and how long they stayed — all in one place. With more couple-specific features, SeekU helps you protect each other and keep your love always connected! Features Always-On Location Tracking Track your partner’s real-time location without needing to open the app. Get updates effortlessly in the background. Low Power, Long Battery Life See your partner’s location anytime without worrying about battery drain or losing connection. Full Location History Access detailed movement history for the past 30 days — including places visited, duration of stay, and travel mode (walking, cycling, by car, etc.). Smart Alerts Set up geofences on the map. Get instant notifications when your partner enters or leaves a specific area. Private Couple Chat Chat with your partner directly on the map, send emojis, and share everything that matters to both of you. One-Tap Navigation Tap your partner’s avatar to instantly navigate to their location — the perfect tool for meetups and spontaneous dates. Device & Signal Insights See your partner’s phone battery level, GPS signal strength, device type, and network status for extra peace of mind. Ready to stay close no matter the distance? SeekU CPL – Keep love on the map. ------- User Agreement:https://base.quthing.com/base/agreement/privacy.html?appPackage=skshpro_ios&appChannel=AppStore Privacy Policy:https://base.quthing.com/base/agreement/user.html?appPackage=skshpro_ios&appChannel=AppStore

Latest Version

4.19.1

Size

124.2 MB

First Released

Aug 2, 2019

Put Your Love on the Map

Join thousands of couples bridging the distance. Download SeekU now to stay connected, stay safe, and build a relationship rooted in trust.

Download on App Store