Publisher
Category
NavigationDownloads
500K+User Rating
Total Ratings
400Locales
12Join over 500K+ musicians using our pro interface.
Join 500K+ users who mastered their instrument with these tools.
Follow movement as it happens with pinpoint accuracy using advanced GPS, GSM, and Wi-Fi technology accessible from any mobile device.
Draw virtual boundaries on your map and get instant text or email notifications the moment your tracker enters or leaves the designated safe zone.
Stay informed with specialized alarms for speed and movement, plus a dedicated SOS button for immediate emergency alerts.
Trusted by 500K+ people who have transformed their experience with this app.
"Tracki has given me such peace of mind. I use it for my father who has early-stage dementia. The geo-fencing alerts me the moment he leaves his neighborhood, and knowing he can press the SOS button if he's lost makes all the difference. It's truly a life-saver."
"I travel internationally for photography and always hide a Tracki in my gear bag. The real-time tracking is incredibly accurate, even across borders. When my luggage was delayed in London, I knew exactly where it was before the airline did. Small, discreet, and reliable—best investment for my equipment."
Everything you need to know about Tracki GPS.
Description
Latest Version
4.0.30
Size
116.6 MB
First Released
Apr 14, 2019
Discover other top-ranked apps in the Navigation category.