Stay protected with the only app integrated directly with ANU Security. Whether you are studying late at the library or walking across campus, get instant access to emergency alerts, real-time location sharing, and direct chat with safety staff.
Publisher
Category
EducationDownloads
6K+User Rating
Total Ratings
0Locales
1Discover the interface used by 6K+ users.
The tools that make this app stand out, trusted by 6K+ users.
Send your real-time location to ANU Security instantly in a crisis, turning your smartphone into a powerful personal safety beacon.
Get help without the stress of a phone call. Discreetly message safety staff to report concerns or ask for assistance in real-time.
Receive immediate push notifications and life-saving instructions directly from the university during on-campus emergencies.
Trusted by 6K+ people who love this app.
"As an undergraduate who often spends late nights at the Chifley Library, ANUOK has become my ultimate safety net. The Mobile Bluelight feature gives me incredible peace of mind while walking back to my residence, knowing security can see my location in real-time if I ever feel unsafe. It is truly an essential tool for every student on campus."
"Moving from the US for my exchange program was a huge adjustment, but having ANUOK made me feel secure from day one. The 'Chat with Security' feature is fantastic for reporting minor concerns without the stress of a phone call. It’s a professional, well-integrated app that makes the entire ANU community feel much more connected and protected."
Everything you need to know about ANUOK.
Description
Latest Version
4.1
Size
28.5 MB
First Released
Jan 6, 2016
Top-ranked apps in the same category
Duolingo, Inc
DEEP FLOW SOFTWARE SERVICES - FZCO
Wuhan Jiakaobaodian Information Service Co., Ltd.
Toca Boca AB
Google LLC
Guangzhou Polar Future Culture Technology Co., Ltd
GAUTHTECH PTE. LTD.
Student Information Consultation Service Co., Ltd.
Aleksandr Ulitin