Istanbul Metro Guide and Route Planner

Istanbul Metro Guide and Route Planner

Download on App Store
Spark by MWM logo
Logo of Istanbul Metro Guide and Route Planner

Istanbul Metro Guide and Route Planner: Navigate Like a Local

The ultimate offline companion for the independent explorer. Plan your trips with precision, calculate exact costs, and find stations via AR—no data plan or roaming required.

Publisher

Discover Ukraine LLC

Category

Travel

Downloads

175K+

User Rating

1.0/5

Total Ratings

0

Locales

12

Navigate Like a Local

Discover the interface used by 175K+ users.

Istanbul Metro Guide and Route Planner app on a smartphone screen with a metro station background

Istanbul Metro Guide and Route Planner app on a smartphone screen with a metro station background

Istanbul Metro Guide app showing a route planner with travel time, distance, and price in TRY

Istanbul Metro Guide app showing a route planner with travel time, distance, and price in TRY

Istanbul Metro Guide app interface showing a route plan with travel time distance and fare in Turkish Lira

Istanbul Metro Guide app interface showing a route plan with travel time distance and fare in Turkish Lira

Istanbul Metro Guide app map view showing a walking route to Karakoy station

Istanbul Metro Guide app map view showing a walking route to Karakoy station

Istanbul Metro Guide app info screen showing ticketing and flight updates

Istanbul Metro Guide app info screen showing ticketing and flight updates

Navigate Istanbul Like a Local

The tools that make this app stand out, trusted by 175K+ users.

📵

100% Offline Functionality

Save on expensive roaming charges. Plan routes and access high-quality maps without needing an internet connection or local SIM.

💰

Exact Trip Cost Calculator

Travel with peace of mind. Know the exact fare before you board and avoid the confusion of local pricing or overpaying for taxis.

👁️

AR Station Discovery

Find your way instantly. Use Augmented Reality to visually locate the nearest metro entrance even in the busiest historic districts.

Loved by users worldwide

Trusted by 175K+ people who love this app.

"

"I used this app during my solo trip to Istanbul and it was a total game-changer. The offline maps saved me so much money on data roaming, and the AR feature helped me find the station entrances in the middle of crowded markets. I felt like a local!"

Sarah M., Independent Traveler
"

"Incredible tool for short layovers. The real-time airport updates and precise route planner took all the stress out of getting back to the terminal on time. Having the directions right on my Apple Watch meant I could keep my phone tucked away while moving through the city."

David L., Business Consultant

About the app

Everything you need to know about Istanbul Metro Guide and Route Planner.

Description

The Istanbul Metro Guide is the quick and easy way to navigate your way into and around the city using the rapid transit railway network. Key features: - Accurate and up-to-date metro maps - Quick and convenient route planer with travel time and distance information - Exact trip cost calculator - Find the nearest Metro station to you using the Augmented Reality function - Useful information about routes, prices and payment options - Integrated Google and Apple Maps according to preference (offline map available to download separately) - Works offline - Real-time airport arrival and departure updates.

Latest Version

1.6

Size

38.9 MB

First Released

Aug 17, 2015

Navigate Istanbul Like a Local—Even Offline

Join 175,000+ independent travelers. Plan routes, calculate costs, and find the nearest station with AR. Perfect for your next adventure or layover.

Download on App Store