Publisher
Category
NavigationDownloads
1M+User Rating
Total Ratings
50K+Locales
29Join over 1M+ musicians using our pro interface.
Join 1M+ users who mastered their instrument with these tools.
Stay ahead of the curve with instant notifications on police traps, red-light cameras, and mobile speed zones reported by a global network of drivers.
Use our radar alongside Google Maps or Waze. Receive discreet alerts even when your phone is locked or while using other navigation apps.
Avoid 'speedometer anxiety' with intelligent warnings that alert you when you exceed local limits near enforcement zones, protecting your wallet and insurance rates.
Trusted by 1M+ people who have transformed their experience with this app.
"This app is an absolute lifesaver for my daily commute into the city. I love that it runs in the background while I use my primary navigation. It’s saved me from several hidden speed cameras that I would have definitely missed. It’s like having a co-pilot who’s always looking out for my wallet."
"As someone who travels across state lines frequently for work, this is the most reliable radar app I've found. The community reporting is spot-on, and the integration with my Apple Watch makes alerts so much more convenient. It gives me peace of mind on long drives knowing I won't be caught off guard by a speed trap."
Everything you need to know about Speed Cameras Radar.
Description
Latest Version
1.47
Size
32.3 MB
First Released
Dec 22, 2015
Apps with similar features and user experience
waze
DoItWell Application Ltd
Alan Costa
GOLDLAB APPLICATIONS YAZILIM VE BILISIM ANONIM SIRKETI
Iteration Mobile S.L
DIRECT CURSUS COMPUTER SYSTEMS TRADING LLC
TomTom
ASFINAG MAUT SERVICE GMBH
KingwayTek Technology Co., Ltd.