Publisher
Category
EducationDownloads
487K+User Rating
Total Ratings
27K+Locales
1Discover the interface used by 487K+ users.
The tools that make this app stand out, trusted by 487K+ users.
Save on expensive US mobile plans. Access video lessons and pedagogical materials without consuming your network data, perfect for studying during commutes or breaks.
Manage your entire academic journey from abroad. Issue enrollment certificates, track grades, and handle tuition payments directly in the app without the bureaucracy.
No need for a computer. From watching classes to interacting with tutors and checking your academic calendar, everything you need for your degree fits in your pocket.
Trusted by 487K+ people who love this app.
"The Unicesumar Studeo App is a lifesaver for my routine here in Orlando. I can watch my video lessons during my commute without worrying about my data plan. Having my grades, calendar, and even tuition slips all in one place makes balancing work and studies so much easier."
"Living in Massachusetts and pursuing a degree from Brazil seemed like a challenge until I started using the app. The interface is so intuitive, and being able to solve administrative issues or talk to my tutors directly from my phone gives me the flexibility I need as a busy professional."
Everything you need to know about Unicesumar Studeo App.
Description
Latest Version
1.8.51
Size
58.8 MB
First Released
Jul 30, 2019
Apps with similar features and user experience
Sociedade De Ensino Superior Estacio de Sa Ltda
Qassim University
UNISTUDENTS P.C.
ClassLink, Inc.
Yordam Mobil
Comcigan Co., Ltd.
Clever Inc.
Edupoint
Saudi Ministry of Education