eero wifi system

eero wifi system

Download on App StoreDownload on Google Play
Spark by MWM logo
Logo of eero wifi system

eero wifi system: Reliable, fast WiFi for every corner of your home

Set up your network in minutes, manage screen time with a tap, and protect your family with advanced security designed for the modern smart home.

Publisher

eero LLC

Category

Lifestyle

Downloads

10M+

User Rating

4.8/5

Total Ratings

201K+

Locales

15

Control at Your Fingertips

Discover the interface used by 10M+ users.

Home dashboard of the eero wifi app showing network status and connected devices by room

Home dashboard of the eero wifi app showing network status and connected devices by room

A screenshot of the eero app showing a family profile with internet pause and bedtime schedule settings

A screenshot of the eero app showing a family profile with internet pause and bedtime schedule settings

Screenshot of the eero app guest network settings page with options to share wifi details via QR code.

Screenshot of the eero app guest network settings page with options to share wifi details via QR code.

eero app showing successful wifi network setup confirmation screen

eero app showing successful wifi network setup confirmation screen

Take Command of Your Home Connectivity

The tools that make this app stand out, trusted by 10M+ users.

⏱️

Manage Screen Time

Pause the internet or create custom schedules to ensure your family stays focused when it matters most.

🛡️

Pro-Grade Security

Protect every connected device with automatic updates and advanced tools that keep your personal data safe.

📶

Seamless Home Coverage

Eliminate dead zones and enjoy 4K streaming or crystal-clear video calls from any room in the house.

Loved by users worldwide

Trusted by 10M+ people who love this app.

"

"As a remote worker with three kids, this app is a lifesaver. I can finally get a strong signal in the backyard office, and the parental controls let me manage screen time without any arguments. It is intuitive, fast, and gives me total control over our home network."

Sarah M.
"

"Setting up our home network used to be a headache, but eero made it incredibly simple. The app walks you through everything, and now our smart home devices run flawlessly. I especially love the security alerts that let me know exactly who is on our guest WiFi."

David L.

Review Analysis

Insights from user reviews.

Sentiment Score

29%
Negative

Summary

The eero app generally receives mixed to negative feedback, with users frequently praising its initial ease of setup. However, many reviews highlight significant issues with network instability, including frequent disconnections and reboots, which are often linked to recent software updates. Users also report persistent app functionality bugs, such as repetitive update notifications that don't resolve, an unresponsive user interface with cut-off menus on newer iOS versions, and inconsistent device management capabilities. These frustrations are often exacerbated by perceived poor customer support and a contentious subscription model that locks essential features behind a paywall.

Common Themes

Network Instability(10)
App Functionality Issues(8)
Device Management & Controls(8)
Login & Initial Setup Problems(8)
User Interface & Experience(6)
Ease of Setup(4)
Customer Support(4)
Subscription Model & Costs(4)

About the app

Everything you need to know about eero wifi system.

Description

The eero app allows you to easily set up and manage your eero WiFi system (sold separately). The world’s first home WiFi system, eero blankets your home in fast, reliable WiFi. eero stays new and gets better with frequent software updates, improving performance, while also bringing new features and security improvements. It’s simple to set up and easy to manage. With a network that expands as far as you need, you’ll finally be able to stream, work, and play, from every corner of your home — and from the backyard, too. eero features: - Setup in minutes - Automatic updates with new features, performance improvements, and the latest eero security standards - View and manage your network from anywhere - Easily and securely share your network with guests - Schedule or pause internet access to manage screen time - Block devices from using your network - eero Plus (sold separately) - a subscription service that includes advanced security, additional parental controls, and VIP access to our team of WiFi experts. It also includes a suite of online security solutions, including a password manager, antivirus software, and a VPN powered by Guardian. We want to hear your feedback. For any feature requests or thoughts on how we can improve, reach out at support@eero.com. By using this app, you agree to eero’s Terms of Service (https://eero.com/legal/tos) and Privacy Policy (https://eero.com/legal/privacy).

Latest Version

6.65.1

Size

136.0 MB

First Released

Feb 23, 2016

Ready for a Faster, Smarter Home?

Join over 10 million users who have traded buffering for bliss. Download the eero app to set up your system, manage screen time, and secure your family’s digital life in minutes.

Download on App StoreDownload on Google Play
FAQ

Frequently Asked Questions

Everything you need to know about eero wifi system

What is the eero app used for?

The eero app manages your eero WiFi system, allowing for easy setup and network management. It provides a central point to control all eero features.

Does the eero WiFi system receive software updates?

Yes, eero receives frequent automatic software updates. These updates improve performance, introduce new features, and enhance the latest eero security standards.

Can I manage my eero WiFi network remotely?

Yes, the eero app allows you to view and manage your eero WiFi network from anywhere using your mobile device.

How does the eero app help with screen time management?

The eero app helps manage screen time by allowing you to schedule or pause internet access for specific devices or user profiles.

Does the eero app allow guest network sharing?

Yes, the eero app lets you easily and securely share your eero network with guests. It provides internet access while blocking access to your internal network files.

What features does eero Plus include?

eero Plus, a separate subscription service, includes advanced security, additional parental controls, VIP expert access, a password manager, antivirus software, and a Guardian-powered VPN.

Can I see which devices are online in the eero app?

Yes, the eero app displays the number of online and offline devices currently connected to your eero WiFi network, providing an overview of network activity.

Can I create user profiles in the eero app?

Yes, the eero app allows you to create and manage individual user profiles for connected devices, such as family members, for tailored network control.

How can I share my eero guest WiFi network details?

You can share your eero guest WiFi network details by generating and sharing a QR code or the direct WiFi details from within the eero app.

Does the eero app simplify network setup?

Yes, the eero app simplifies setting up your eero network. It provides guided steps for device installation and network configuration in minutes.

Does the eero app show connected eero devices?

Yes, the eero app displays a list of your connected eero devices, including their location within your home, such as "Living Room eero Pro 7".

How does the eero guest network protect my main network?

The eero guest network protects your main network by granting internet access to guests while blocking their access to your personal network files, streaming audio, and smart devices.

Does eero provide parental controls?

Yes, the eero app provides parental controls, allowing you to schedule or pause internet access for specific profiles. eero Plus offers additional advanced parental controls.

Can I block specific devices from my eero network?

Yes, the eero app allows you to block specific devices from using your eero network, giving you control over who accesses your WiFi.

Where can I find the eero Terms of Service?

The eero Terms of Service are available for review on the eero website at https://eero.com/legal/tos.

Where can I find the eero Privacy Policy?

The eero Privacy Policy is available for review on the eero website at https://eero.com/legal/privacy.