AlfredCircle: Location Tracker

AlfredCircle: Location Tracker

Download on App StoreDownload on Google Play
Spark by MWM logo
Logo of AlfredCircle: Location Tracker

AlfredCircle: Location Tracking for True Peace of Mind

Stop sending 'Are you there yet?' texts. Get real-time updates and instant arrival alerts for your kids, parents, and friends with the world’s simplest family safety app.

Download on App Store

Publisher

Alfred Systems Inc.

Category

Lifestyle

Downloads

1K+

User Rating

4.8/5

Total Ratings

100

Locales

14

Peace of Mind at a Glance

Discover the interface used by 1K+ users.

AlfredCircle app interface showing family members real-time locations on a map and their status list

AlfredCircle app interface showing family members real-time locations on a map and their status list

AlfredCircle app displaying a real time arrival notification on a map for family safety

AlfredCircle app displaying a real time arrival notification on a map for family safety

Screenshot of AlfredCircle app showing a detailed family location history timeline with maps of driving and walking routes

Screenshot of AlfredCircle app showing a detailed family location history timeline with maps of driving and walking routes

Map view showing daily location history and trip routes in the AlfredCircle app

Map view showing daily location history and trip routes in the AlfredCircle app

Safety and Peace of Mind, Simplified

The tools that make this app stand out, trusted by 1K+ users.

📍

Real-Time Inner Circles

Share live location updates with your family and friends to ensure everyone stays safe and connected, wherever they are.

🔔

Smart Place Alerts

Get instant notifications when your kids reach school or your partner leaves the office, eliminating the need for 'Are you there?' texts.

Designed for Everyone

A cute and simple interface that is a breeze to navigate, making it perfect for children, parents, and elderly family members alike.

Loved by users worldwide

Trusted by 1K+ people who love this app.

"

"AlfredCircle has been a lifesaver for our family. I no longer have to text my son every five minutes to see if he has made it to soccer practice. The 'Places' notifications are instant and give me such peace of mind while I am at work."

Sarah M., Busy Mom of Two
"

"I have been using AlfredCamera for years, so I jumped at the chance to try AlfredCircle. It is incredibly simple to set up, even for my elderly father. Knowing exactly when he gets back from his morning walk or the grocery store is a huge relief for our whole family."

David L., Family Caregiver

About the app

Everything you need to know about AlfredCircle: Location Tracker.

Description

Built with your safety in mind, AlfredCircle lets you stay connected with your friends and family. Just add them to your Circle, and you'll get real-time location updates.
 Get started today and keep your Circles safe! 【Stay in the Loop with Circles】 Invite your loved ones to join your Circle and share live location updates with each other. Enjoy the peace of mind knowing that: • Your kids are safe on their way home from school. • Your friends are back safely from a night out. • Your elderly mom has reached the grocery store. • Your son has boarded his flight without issues. • Your partner is on time for dinner. • Your brother is on his way with your coffee. • And so much more… 【Get Real-Time Location Alerts with Places】 • Routine-Based Selection: Select different Places to add to your Circle based on each member’s daily routine. • Immediate Notifications: Get notified immediately for arrivals and departures from homes, offices, schools, train stations, and other locations. • Peace of Mind: Go about your day knowing your loved ones are safe and sound. • Versatile Use: Whether you’re exploring a new city or meeting up with friends at a local coffee shop, add up to 4 Places to your Circle at any time to ensure a smooth experience. 【Cute and Simple Interface You'll Adore】 AlfredCircle is for everyone. That's why we made sure it's easy to navigate and a breeze to connect, no matter where you are. As they say, sharing is caring. The AlfredCircle family is here to make that happen for you. Download AlfredCircle for free to get started today! Terms of Service: https://www.alfredcircle.com/legal/terms-of-service

Latest Version

2025.5.0

Size

89.8 MB

First Released

Jul 16, 2023

Start Protecting Your Inner Circle Today

Stop sending 'Are you home yet?' texts. Join thousands of families using AlfredCircle for effortless, real-time peace of mind. Download for free and stay connected.

Download on App StoreDownload on Google Play