The modern, battery-efficient way to stay connected. Share your location, routes, and weather with loved ones using best-in-class technology that respects your privacy and your battery life.
Publisher
Category
Social NetworkingDownloads
56K+User Rating
Total Ratings
1K+Locales
8Discover the interface used by 56K+ users.
The tools that make this app stand out, trusted by 56K+ users.
Get the fastest, most accurate location updates without draining your iPhone battery or compromising your personal data.
Skip the 'Where are you?' texts. Get instant notifications when friends or family arrive at home, school, or work.
Share your journey and ETA in real-time so loved ones can see you're safe and know exactly when to expect you.
Trusted by 56K+ people who love this app.
"Finally a tracker that doesn't drain my battery by noon! I use Teem to keep an eye on my daughter's walk home from school and it is incredibly accurate. The privacy features are what sold me – knowing our location data isn't being sold or tracked when the app is closed is a huge relief for our family."
"Teem is the most aesthetic and smooth location app I've used since Zenly. My friends and I switched here because the UI is so clean and it doesn't lag. The 'urgent message' feature is a lifesaver when someone has their phone on Do Not Disturb and we're trying to coordinate a meetup."
Everything you need to know about Teem: Phone Location Tracker.
Description
Latest Version
3.5.1
Size
186.3 MB
First Released
Dec 18, 2023
Everything you need to know about Teem: Phone Location Tracker
Teem is a fast, simple, and private location tracker designed for friends and loved ones. It helps users stay connected by sharing real-time locations, managing notifications, and enabling direct messaging.
Teem ensures maximum privacy by updating a user's location only when the person they are sharing with opens the app. Location updates cease immediately once the app is closed by the recipient.
Yes, Teem can send notifications when your loved ones arrive at or leave specific places that you have added. This feature helps users stay informed about their contacts' movements.
Yes, Teem allows users to share their route when they are heading to loved ones. This enables contacts to view your progress on the map and anticipate your arrival time.
Yes, Teem provides a feature for sending messages in urgent situations. These messages are delivered to the recipient even if their phone is set to Do Not Disturb mode.
Yes, Teem allows users to see the current weather conditions for their friends and loved ones' locations. This provides a convenient way to check in or show you care.
Teem utilizes best-in-class technology for location tracking, updating faster and more accurately than many other trackers. It also operates with minimal battery consumption.
Teem offers user support through its in-app Settings tab. Additionally, users can access support resources and information on the official website: teemtracker.com/support.
No, Teem does not share user data with any third parties. The app states its independence and commitment to not sharing data, aiming to be a trustworthy location tracker.
Yes, Teem includes a 'People' list where you can view all your contacts. This list displays their current status, distance from you, and last known location details.
Teem allows users to share their live location for specific durations, including 30 minutes, 2 hours, 8 hours, or indefinitely. Users select the preferred time frame for sharing.
Apps with similar features and user experience
Zhenshi
晨铭 李
UU Momentum Network Technology Co., Ltd.
Chongqing Daimaxiaoying Technology Co., Ltd
busra gokturk
UAB MR Digital Group
Alfred Systems Inc.
Muljibhai Vaishnav
晨铭 李